Construction Drawing QA/QC Checklist
A comprehensive checklist for reviewing construction documents before they reach the field
Quality control on construction drawings is one of the highest-ROI activities in project management. Every issue caught during plan review is an RFI avoided, a change order prevented, and a schedule delay eliminated. This checklist covers the critical categories that cause the most problems in the field.
1. Cross-Discipline Coordination
Structural grid lines match architectural grid lines
Column locations consistent across all disciplines
Floor elevations match between architectural and structural
MEP clearances verified against structural elements
Ceiling heights accommodate ductwork and piping
Door swings clear of obstructions
Equipment locations coordinated with structural supports
2. Dimensions and Measurements
All rooms dimensioned
Dimension strings add up correctly
No conflicting dimensions between plans and details
Scale noted on all drawings
Critical clearances explicitly dimensioned
Finish floor elevations noted
Ceiling heights specified
3. Code Compliance
Egress widths meet code requirements
Exit signage locations shown
Fire-rated assemblies clearly noted
Accessible routes identified and compliant
Plumbing fixture counts adequate for occupancy
Handrail and guardrail heights specified
Fire separation distances verified
4. Specifications and Notes
Material specifications complete
Finish schedules match plan notations
Hardware schedules complete
Detail references valid and present
Specification sections referenced correctly
No conflicting notes on same drawing
Legend symbols used consistently
5. Structural
Foundation plan matches architectural footprint
Beam sizes and locations noted
Column schedules complete
Load-bearing walls identified
Penetrations through structure coordinated
Expansion joints located and detailed
Connection details provided
6. MEP Systems
Electrical panel locations shown
Plumbing fixture locations match architectural
HVAC equipment sized appropriately
Duct routing doesn't conflict with structure
Fire sprinkler coverage adequate
Utility connections located
Equipment access and service clearances provided
Automate 80% of This Checklist
Manual QA/QC review is thorough but time-consuming. Articulate's AI can automatically check your drawings against most items on this checklistâidentifying issues with exact locations on your PDFs in minutes instead of hours.
Focus your team's expertise on judgment calls while AI handles the systematic checking.
Try Automated QA/QC Free